Cookie Preferences

We use cookies to provide a better user experience and personalised service. By consenting to the use of cookies, we can develop an even better service and will be able to provide content that is interesting to you. You are in control of your cookie preferences, and you may change them at any time. Read more about our cookies.

Skip to content

Electricity prices valid until further notice

Herrfors’ fixed electricity prices since 1.9.2025

Prices shown include VAT 25,5 %.

You can choose the fixed-price contracts valid until further notice if your point of consumption is located within the Herrfors Nät-Verkkos distribution area, your electricity consumption is below 100,000 kWh per year, and you have not had these or the Vakaa+ products at that point of consumption during the past 12 months. Switching between Stable and Stable + is allowed. The product waiting period does not apply to our obligation-to-supply products (Obligation-to-Supply Product and Spot+).

The energy prices include Fingrid’s balancing service fee of 0.169 c/kWh (incl. VAT), which is valid from 1 September 2025 onward. Any changes in the balancing service fee will correspondingly affect the energy price.

General electricity100 % Renewable Energy
Basic fee4,05 €/month4,05 €/month
Energy rate8,86 c/kWh9,11 c/kWh
Day and night electricity100 % Renewable Energy
Basic fee4,05 €/month4,05 €/month
Energy rateDay9,06 c/kWh9,31 c/kWh
Night7,76 c/kWh8,01 c/kWh
Seasonal electricity100 % Renewable Energy
Basic fee7,59 €/month7,59 €/month
Energy rateWinter day11,16 c/kWh11,41 c/kWh
Other times6,71 c/kWh6,96 c/kWh

Energy rate winter day: Mon-Sat 1.11.-31.3. 07-22
Energy rate other times: Sundays and 1.4.-31.10. around the clockand Mon-Sat 1.11.-31.3. 22-7

Supply obligation product* since 1.7.2025
Basic fee4,05 €/month
Energy rate10,90 c/kWh

*Supply obligation refers to a point of delivery located within the distribution area of Herrfors Nät-Verkko Oy Ab’s electricity network, where the annual electricity consumption does not exceed 100,000 kWh or the main fuse is no larger than 3 x 63 A.